Where Is The Compute?

Power & cluster atlas

Follow the watts: the named sites behind the numbers, with power, chips, status and how sure we are. Named sites only. Power and chip counts are what operators or reporters published; blanks mean no number was published in our sources, not zero. Grid positions are schematic, not geographic.

Power by site

Power at named AI sites (MW)Colossus 2: not published; Colossus 1: over 300 MW; Prometheus: ~1,000 MW; Hyperion: 2,000–5,000 MW01K2K3K4K5KMW · hatched = announced target · solid = stated floor · amber = range or floorHyperionMeta2 GW by 2030, up to 5 GW over several years2,000–5,000 MWPrometheusMeta~1 GW announced target ('gigawatt-scale'; see D7)~1,000 MWColossus 1SpaceXAI (xAI)over 300 MW (floor)over 300 MWColossus 2SpaceXAI (xAI)not published
Hatched = announced target; solid = stated floor at an operating site; amber whisker or arrow = range or “over”. Colossus 2’s power isn’t in our sources, so it has no bar.
Show data table
Named AI sites
SiteOperatorStatusPowerChipsAs ofConfidence
Colossus 2SpaceXAI (xAI)operating, expandingnot published550,0002026-10-01operator-reported count (not an independent audit)
Colossus 1SpaceXAI (xAI), capacity rented to Anthropicoperatingover 300 MWover 220,0002026-05-06company-stated floor
PrometheusMetaphase 1 operating; scaling~1,000 MWnot published2026-10-19operator-reported; deployed count not disclosed
HyperionMetaannounced / under development2,000–5,000 MWnot published2026-10-19announced target

Download the atlas (CSV, free)

Scale

Cluster scale: one square = 10,000 GPUs

Largest AI clusters by GPU count; one square = 10,000 GPUsColossus 2: 550,000 GPUs deployed + 440,000 announced; Prometheus: “hundreds of thousands” deployed (no exact count); ~1,000,000 target; Colossus 1: over 220,000 GPUs (floor)Colossus 2SpaceXAI · Memphis550,000 deployed+440,000 announcedPrometheusMeta · New Albany, OHdeployed: not disclosed~1,000,000 targetColossus 1SpaceXAI → Anthropicover 220,000floor (“over”)1 square = 10,000 GPUs (not H100e) · blue = deployed · green = announced · dashed = target · arrow = “over”
GPU counts, not H100e, as reported by operators. Prometheus’s deployed count isn’t published, so only its ~1M target is outlined. Colossus 1 is a floor (“over 220,000”).
Show data table
Largest clusters (GPU count)
ClusterReportedAs ofConfidenceSource
Colossus 2550,000 GPUs deployed + 440,000 announced2026-10-01operator-reported count (not an independent audit)State of AI Report Compute Index (Nathan Benaich, Air Street Capital) — “Who has the largest GPU cluster in this index?” (2026-10-01)
Prometheus“hundreds of thousands” deployed (no exact count); ~1,000,000 target2026-10-19operator-reported: 'hundreds of thousands' deployed (no exact count); ~1M GPU targetMeta Engineering — “Inside Prometheus: Meta's Journey to a Gigawatt-Scale Supercluster” (2026-10-19)
Colossus 1over 220,000 GPUs (floor)2026-05-06company-stated floor ('over 220,000 NVIDIA GPUs', >300 MW)Anthropic — “Higher usage limits for Claude and a compute deal with SpaceX” (2026-05-06)
Chart page & embed

Sources: State of AI Report Compute Index (Nathan Benaich, Air Street Capital), “Who has the largest GPU cluster in this index?” (2026-10-01); Meta Engineering, “Inside Prometheus: Meta's Journey to a Gigawatt-Scale Supercluster” (2026-10-19); Anthropic, “Higher usage limits for Claude and a compute deal with SpaceX” (2026-05-06)

High-voltage transmission towers at night leading to a brightly lit industrial site
Illustration (AI-generated), not a real facility.